Full-Service General Contractor for Architects & Designers

High-end renovations built exactly as designed, across New York City and Northern New Jersey.

SEND YOUR DRAWINGS

Fully insured, certificates issued to your building

Licensed master plumbers and electricians

EPA Lead-Safe Certified

Co-op, condo and Landmarks approvals

Run by builders with 25 years in New York City

about us

Full-Service General Contracting in NYC & New Jersey

Meraki Remodeling is a full-service general contractor for high-end residential renovations and boutique commercial spaces in Manhattan, Brooklyn and Northern New Jersey. We take every project from drawings to closeout: preconstruction review, line-item pricing, permits and board approvals, construction, and closeout, built exactly as the architect or designer drew it. Meraki is run by builders who have worked in New York City buildings for 25 years. Work is performed under NYC Home Improvement Contractor license #1357367-DCA, held by Renovation By My Home, Inc., the construction company behind Meraki. Fully insured.

bathroom renovations nyc
kitchen renovations NYC

who we build for

Two Ways We Work

co-workers working on project and discussing together with looking at blueprint paperwork

for architects and designers

Send the Drawing Set

We return a line-item bid with our questions marked on the drawings, then build it as drawn and report to you and your client every week.

luxury open style kitchen in apartment

for owners with plans

Your Plans, Priced Line by Line

Your architect has finished the drawings and you are collecting bids. Send them with your building’s alteration agreement and we will price the job line by line.

our process

From Drawings to Closeout

Six steps, one team. The architect and the owner always know where the job stands.

1. Drawings and Building Rules

Send the drawing set and your building’s alteration agreement. We read the building’s rules before we price anything.

2. Site Walk

We walk the apartment against the drawings: electrical capacity, asbestos and lead, wet-over-dry conditions, and every wall that moves.

3. Line-Item Bid

A priced scope written sheet by sheet. Allowances, exclusions and optional items are listed separately, with our questions on the drawings.

4. Board and Permits

We put together the alteration package, answer the building architect’s review, and file with DOB and Landmarks. On our recent co-op jobs this took 3 to 6 months.

5. Construction

A week-by-week schedule, protection to the building’s standard, written change orders, and weekly photo updates to the architect and the owner.

6. Closeout

A punch list worked to zero, final inspections, permit sign-off, and a closeout binder with the scope, specs and warranties.

SEND YOUR DRAWINGS
Pre-war windows at 907 Fifth Avenue, a Fifth Avenue landmark co-op, with a radiator cover and built-in being fitted below

board and permits

We Get Your Alteration Through the Building

In a Manhattan co-op, the building approves the work before anyone picks up a tool. We put together the full package and answer every comment until it is approved.

The signed alteration agreement, the scope of work, the architect’s drawing set, insurance certificates for every trade naming the building and its managing agent, and the trade licenses the building asks for.

Most co-ops send the plans to their own architect, and many send that architect back to inspect the work. We answer every comment letter point by point and book the benchmark inspections: after demolition, plumbing, waterproofing and soundproofing, then the final walkthrough.

We file with the Department of Buildings and, in a historic district, with the Landmarks Preservation Commission. Several of our recent co-ops sit in landmark districts on Fifth Avenue and the Upper West Side.

If the new kitchen needs more power than the apartment has, we get the load letter early. Neighbors get written notice before noisy work starts.

On our recent co-op jobs, approvals took 3 to 6 months. We build the schedule around it.

our standards

Built to the Drawings

Slab marble bathroom under construction at the 115 Mercer Street penthouse in SoHo, with floating wood vanity and tub

The drawings are the contract. Here is how we keep the finished apartment matching them.

Our scope follows the drawings line by line, down to the waterproofing product and how far it runs up the bathroom walls.

When a kitchen or bath moves over a dry room below, the building has to approve it and the floor needs a waterproof membrane and sound mat. We flag it at the bid, not at the board.

Nothing in the drawings is swapped without the architect’s written approval. If a specified item has a long lead time, we flag it on day one, not in week ten.

Every change order is written, priced and signed before the work goes ahead. No surprises on the final invoice.

A named project manager from first call to final walkthrough, and a full-time superintendent on complex projects.

GET AN ESTIMATE

the schedule

What 13 Weeks of Construction Looks Like

The actual build schedule from one of our recent co-op jobs: a kitchen, primary bath, guest bath and powder room, once approvals were in.

Weeks 1-2

Protection, demolition, debris out. Plumbing rough and framing start.

Weeks 3-4

Plumbing and electrical rough, framing done. Walls start closing.

Week 5

Walls closed. Waterproofing and soundproofing.

Weeks 6-7

Floor tile and wood floors. Cabinets and bath wall tile start.

Week 8

Cabinets and wall tile done. Counters templated.

Weeks 9-10

Baseboards, moldings, millwork and paint. Appliances and fixtures in.

Weeks 11-13

Trim, closet shelving, touch-ups, cleaning crew.

Holidays, change orders, building water shutdowns and inspections add time. We tell you which ones apply before we start.

occupied buildings

Working in a Building Where People Live

These are the conditions co-op boards write into the alteration agreement. We work to them on every job.

  • Floors and hallways covered with Masonite and sound board before work starts
  • Front door sealed, service entrance zipped, a HEPA negative-air fan running whenever we work
  • Hallways HEPA-vacuumed and damp-mopped every day
  • Written notice to neighbors 10 days before noisy work
  • Debris removed the way the building allows, on its schedule

Selected Projects

Board-approved apartment renovations in Manhattan, built by Meraki.

Finished primary bathroom at 907 Fifth Avenue, a Fifth Avenue landmark co-op: glass shower with bench, lit mirror, patterned floor

Fifth Avenue Landmark Co-Op, 907 Fifth Avenue

  • Scope: Full apartment: kitchen opened up, primary and guest baths expanded, new laundry, new bedroom entrance, new HVAC
  • Approvals: Building-architect plan reviews and eight field inspection reports, LPC permit, DOB-approved plumbing and mechanical plans
  • Built to spec: Kemper waterproofing at every new wet area, plaster crown moldings and herringbone floors protected and kept
Slab marble kitchen counter and backsplash going in over wood cabinets at the 115 Mercer Street penthouse in SoHo

SoHo Penthouse Duplex, 115 Mercer Street

  • Scope: Kitchen, three baths and a powder room built from the interior designer’s drawings, about 2,175 square feet of oak floors refinished, full repaint
  • Approvals: Condominium alteration agreement, plumbing and electrical permits filed and closed
  • Built to spec: Large-format slab marble on bath floors and walls, floating vanities, Sub-Zero
Bedroom window with city view during the renovation at 60 East End Avenue, Upper East Side co-op

Upper East Side Co-Op, 60 East End Avenue

  • Scope: Kitchen and primary bath expanded, guest bath, powder room
  • Approvals: Building architect’s review, wet-over-dry approval by the board, DOB permit
  • Specified: Wolf, Sub-Zero, Miele, Fisher & Paykel
Pre-war living room at 450 West End Avenue during renovation, plaster mouldings kept and the floor opened up

Upper West Side Landmark Co-Op, 450 West End Avenue

  • Scope: Kitchen moved and enlarged to create a third bedroom, primary bath enlarged, half bath and laundry relocated
  • Approvals: Building architect’s review, LPC Certificate of No Effect in the Riverside-West End Historic District, DOB filing
  • Specified: La Cornue range, TOTO fixtures

Installed to spec on our jobs: Wolf, Sub-Zero, Miele, Fisher & Paykel, La Cornue, TOTO

closeout

Finished Means Closed Out

The job ends with a written punch list worked to zero, final inspections called, the permit signed off, and a closeout binder for the owner with the scope, specs, product sheets and warranties. On a recent co-op job that binder ran 57 pages.

not just residential

NYC & New Jersey Commercial General Contractors

GET AN ESTIMATE

Latest Blogs

Notes on co-op approvals, preconstruction and building to the drawings.

Frequently Asked Questions About General Contractors NYC

On our recent co-op jobs, approvals took 3 to 6 months. It depends on the building, its architect and whether the plan creates a wet-over-dry condition.

On a recent co-op job, a kitchen, primary bath, guest bath and powder room ran on a 13-week schedule after approvals. Holidays, change orders, water shutdowns and inspections add time.

We are a full-service general contractor that builds the architect’s or designer’s design exactly as drawn. We read every drawing before work starts, price the job line by line, manage the approvals, and report to the architect and the owner at the same time.

Yes. Send us the drawing set and any building requirements, and we return a line-item estimate with our questions on the drawings.

Manhattan, Brooklyn and Northern New Jersey, starting with Bergen County, for residential and commercial work.

Full home renovations, kitchens, bathrooms and boutique commercial spaces such as offices, retail and hospitality, built from an architect’s or designer’s drawings.

We don’t create design drawings, we bring them to life. We work closely with your architect or interior designer to ensure that every detail of their vision is built exactly as intended.

We operate with a fully open-book policy. Clients and design teams have access to real-time budget tracking, project updates, and milestone reporting to maintain complete clarity from start to finish.

Yes. Our team manages DOB permitting, building board submissions, and local approvals, ensuring full compliance with NYC and New Jersey regulations so your project progresses smoothly.

We specialize in landmark and occupied renovations, applying noise control, staging strategies, and precise scheduling to minimize disruption while adhering to strict preservation and code standards.

We create detailed preconstruction plans and phased schedules to keep projects on track. Our process anticipates challenges early, ensuring on-time completion without compromising quality.

Every detail, from material alignment to lighting placement, is built to match the design plan exactly. Our field teams are trained to uphold architectural detailing standards, ensuring your vision is executed without compromise.

Looking for help? Contact Us Today

Looking for a quote? Contact Us

Let's chat about your project

Have drawings?

Send the drawing set and your building's alteration agreement. We return a line-item bid. Architects and designers: add us to your bid list.

Send your drawings

Partner With Us

Tell us about your project and we will get back to you.

Serving: New York City & Northern New Jersey

bathroom renovations contractors NYC

Send a message